A mobile MVP in 4 days with FlutterFlow, Xano, Firebase & Giphar SSO.

Ahead of a key group event, Giphar wanted to put a mobile application in the hands of pharmacists. The result: an MVP delivered in 4 days, deployed in real conditions, with 9,800 different products pre-ordered through the app.

stack :XanoFlutterFlowFirebase

// context

Giphar is a cooperative grouping founded in 1968, federating around 1,700 independent pharmacists and 1,250 pharmacies in France. A cooperative network built around optimised logistics, shared services and a strong territorial network.

// mission

  • · Authentication via Giphar SSO
  • · Browse laboratories and offers
  • · Scan QR codes at stands
  • · Create pharmacist orders
  • · Push notifications
  • · Android & iOS publishing

// stack

  • · FlutterFlow - iOS & Android mobile app
  • · Xano - API backend
  • · Firebase - push notifications
  • · Giphar SSO - authentication

// challenges

Moving fast without cutting corners on quality or security.

Ahead of a key group event, Giphar wanted a mobile application in pharmacists' hands. The challenge: deliver fast, under real conditions, without compromising on quality or security. A controlled scope, Giphar SSO for authentication, and a deliverable ready for industrialisation. On the ezacae side: a tight, expert team in FlutterFlow, Xano and Firebase, to frame the project, drive the MVP, and upskill the Digital Factory team along the way.

// timeline · 4 days

An intense format, structured from first to last day.

Before the sprint: UI/UX audit of the mockups (flows, navigation patterns, accessibility) and review of the business requirements.

  1. 01

    Day 1 - Scoping

    User flows, MVP prioritisation and scope lock-down with all stakeholders.

  2. 02

    Days 2 to 4 - Build

    Xano models and API, FlutterFlow screens and logic, SSO integration (roles, access), Firebase notifications. Regular checkpoints throughout.

  3. 03

    End of sprint - Delivery

    Demo to stakeholders and preparation of the submission file: assets, privacy policy, store configuration.

// results

A complete MVP, iOS & Android apps ready in 4 days.

4 days

hackathon to deliver the complete MVP

9,800

different products pre-ordered through the app during the forum

iOS & Android

publication files ready at delivery

The MVP covers authentication and all the expected features. After delivery, the team ran several iterations to complete the planned functionality. The application was deployed during the forum and immediately adopted by the teams.

// lessons learnt

What this format taught us.

  • Preparing upfront prevents delays on the store side.
  • UI/UX work done before the sprint makes interface decisions faster and screens more polished from the first pass.
  • The 4-day format works very well, provided the scope, priorities and prerequisites are properly defined upfront.
  • Our key role: build the MVP (Xano, FlutterFlow, Firebase, SSO) and secure store publishing. That's what led us to launch the Squad offer.
"Working with ezacae means collaborating with a team that is pragmatic, available and deeply invested. Their thorough command of our technical stacks (Xano, WeWeb and FlutterFlow) and their practical mindset made the work fluid, efficient and user-centred. A huge thank you to Marie, Pauline, Simon, Lyes and Milo for their attentiveness, their responsiveness and their day-to-day commitment. A wonderful human and digital adventure, and this is only the beginning!"
Rémy Dubois - Digital Factory Manager, Giphar